Back to products
Faster SoundBar Wireless Speaker (Z10)
Faster SoundBar Wireless Speaker (Z10) Original price was: ₨ 8,200.Current price is: ₨ 7,000.

HDMI Cable HIGH SPEED Long Lead 15M

  • 15 METER HDMI CABLE] – 50FT High-Speed HDMI to HDMI Long Lead with Ethernet and ARC (Audio Return Channel). Finished with 24K gold plated connectors for flawless and crisp signal transmission. Our award winning HDMI cables are designed in the UK.
  • [QUALITY MATERIALS] – Our HDMI cables are made to the highest standards. Featuring copper cable and double shielding to ensure smooth data transmission with no interference. Our long cables are ideal for extending your HDMI signal to other areas of the home or workplace. With a durable PVC jacket for easy routing in challenging areas.
  • [WIDE COMPATIBILITY] – These cables are compatible with a range of devices that support HDMI. A perfect match for CCTV, Freeview/Freesat and Sky HD TV, PS4 & Xbox One Gaming Consoles, Blu-Ray & DVD Players, Home Cinema, AV Receivers, PC, Laptops, HDTV, Projectors. They are not compatible with Sky Q, PS4 Pro, Xbox One X and 4K Blu Ray Players when the resolution in set higher than 1080p.
  • [HIGH SPECIFICATION] – Packed with high specifications including Ethernet, CEC, 3D and ARC (Audio Return Channel) Support. Immersive HD surround sound audio including 5.1 & 7.1 Dolby Atmos and DTS X audio. High Resolutions from 720p, 1080i and 1080p at 60Hz. No picture degradation at longer lengths
  • [PREMIUM SERVICE] – Our cables have a 3-year extended warranty as standard and are individually inspected straight on the assembly line. We pride ourselves in providing high quality items and outstanding customer service.

Original price was: ₨ 3,350.Current price is: ₨ 3,050.

17 People watching this product now!
  • Pick up from the Gamestoreisb Islamabad

To pick up today

Free

  • Courier delivery

Our courier will deliver to the specified address

2-3 Days

Charges Add

  • Shipping Charges

Shipping Charges Our Shipping Policy

- Half kg Rs. 500/-
- 5 kg Rs. 1000/-
- 15 kg Rs. 1500/-

Payment Methods:

Description

Customer Reviews